Day 12


Another Shove. Schedule for next week. The carpenter will arrive on Monday to install the shower walls and cut the hole in the ceiling for the attic access. Tuedsay, the electrician will wire the mat for the under floor heat and will move the thermostat. Cabinets will arrive. Mural will be laid out and measured. Still waiting to hear when the wall tile will arrive.


Even with the minor delays, things are still on schedule. Wasn't bad having no work crew here. It was a school vacation week so it was nice to have a day or two to sleep in and unlimited access to a toilet without having to buy something. Himself wasn't feeling well so he stayed home two days from school. He got to watch tv and nap without sawing or pounding going on. Though truthfully, Himself could sleep through anything.


The shower is ugly but it is functional. Nouveau construction. The walls are clean and thoroughly cured. The scroll ceiling is gorgeous.


2 comments:

  1. Ok, I've decided I don't want to see any pictures of the final product... Maybe I shouldn't read any reports either. I want to be totally surprised.

    ReplyDelete